Skid-Steer vs Snow
Brent
Join Date: Posts: 1 |
1999-08-24 7290
I used to use an 8' blower(single auger 2-stage) attached via three point to a John Deere 4430 (125hp) tractor which took about three hours to clear a 6" - 10" snowfall. The last two years I switched to a 6' hydraulic driven blower mounted to the front of my Bobcat 763H skid-loader and cut my time in half. The biggest reasons for that I attribute to being able to turn on a dime and cut the other direction and not having to pick up the overflow from the finished cut from the tractor's reverse being too fast for the blower. It's also very nice to be able to see what's in front of you instead of twisting your neck all the time.
Reply to | Quote Reply | Add Photo
Go Top
Share This